Hi Steve,
Thanks once again for the reply, interesting reading.
One thing I would like to do is run the machine through the Functional Test, but would like some guidance on setting the timer into `test mode'.
In the service manual page you took a picture of it states, link the red and yellow test leads or if not fitted insert bridging connector into socket row 16-17, I don't have either.
The timer wiring diagram which I have a copy of states that pin outs 16B, 16H & 17H are for machine test, which of the three do I link?
Looking at the timer it also has pin outs 17N, 17B, 16N, 16C on socket row 16-17.
Regards,
Sam