We have been wanting another genset -but get turned down-even having the generator from the closed site sent to our site-the powers to be don't want to do that.Even got offers from the Army Corps of Engineers to install a gas turbine generator-5Mw- but it got turned down.The generator was free except for delivory and installation and we would also pay for fuel.Could choose from natural gas or diesel to run it.The combusters on the turbine are made for the fuel you want to use.Cannot be changed in the field.Engine has to go to a rebuild shop.So we have to "baby" the generator we have.