What you'd need ...
1) A very sturdy concrete floor
2) A hot water heater
3) Three phase power (probably)
4) A floor drain (probably)
I have #1 in place in my shop. The rest would be... difficult... if the machines have internal drain pumps, and can take single phase 220, I could do it, I could always hook up a 20 or 30 gallon electric 220 single phase water heater, but... WHY? LOL.