Has anyone had experience with having a solid surface counter top installed to replace a laminate (or other material) counter top? I am having it done through Home Depot (who contracts with a counter top fabricator in Toronto) and both Home Depot and the fabricator say that I must remove my existing sink and counter tops so that the measurements can be done. Because it takes approximately 6 weeks for the counter top to be made I will then be forced to re-install the laminate counter top and sink because I can't go without them for that long - something I was not planning on doing nor have any experience with. I was wondering if anyone else had to do the same thing.
Thanks.
Gary
Thanks.
Gary