Still at work on it...the furnace room is a mess..got belts, pump, water level pressure switch and the water valve redone from John L last weekend and waiting for the epoxy to dry on re-attaching the nipple to the pump cover. Water valve experts, please let me know if the wires are hooked up the right way and which ones are the hot and cold hose attachments..(the service manual was vague).The new fill and drain hoses are ready to go and hopefully by this weekend it will be ready for the big test!..not looking forward to laying it on it's side to put the motor back in, but by taking the front and top panel off, it should make it a bit lighter...the 1960 dryer is ready for drying the first load that comes out of its new mate![this post was last edited: 1/21/2016-17:35]







