dishwashercrazy
Well-known member
A full month of work finally ends.....
I just finished the final hookups and installations in my new laundry room. My brother and I started the evening of July 1st by building the shelf that would become my "Dishwasher Wall". Over the next couple of weeks, he ran all of my new copper pipe for the Washing Machines & Dishwashers, and he ran much of the PVC Drain Pipe. I did much of the air-testing and repairs of the water system; completed the PVC drain; and wired all of the new electrical outlets. My brother came back and helped with the gas line installation for the two dryers, and he drilled the two new holes through the wall for the dryer vents. I worked all day Saturday, August 1st, piping the two dryer vents, relocating my Maytag Neptune set from another location in the basement, and testing every washing machine and dryer in this first picture (except the Pink Maytag P124). The Red 1-18 can't be seen in this photo.
My goal was to have this all complete prior to the upcoming Wash Party.

I just finished the final hookups and installations in my new laundry room. My brother and I started the evening of July 1st by building the shelf that would become my "Dishwasher Wall". Over the next couple of weeks, he ran all of my new copper pipe for the Washing Machines & Dishwashers, and he ran much of the PVC Drain Pipe. I did much of the air-testing and repairs of the water system; completed the PVC drain; and wired all of the new electrical outlets. My brother came back and helped with the gas line installation for the two dryers, and he drilled the two new holes through the wall for the dryer vents. I worked all day Saturday, August 1st, piping the two dryer vents, relocating my Maytag Neptune set from another location in the basement, and testing every washing machine and dryer in this first picture (except the Pink Maytag P124). The Red 1-18 can't be seen in this photo.
My goal was to have this all complete prior to the upcoming Wash Party.
