Heating
Well, my 565 takes about 90 mins to heat to Hot from the cold water supply on the high setting.
My Wilkins Servis 501 is about the same.
Obviously, it would be less if the incoming water was warm.
Cheers
Leon
Well, my 565 takes about 90 mins to heat to Hot from the cold water supply on the high setting.
My Wilkins Servis 501 is about the same.
Obviously, it would be less if the incoming water was warm.
Cheers
Leon