Well it's been almost a year since I started my "spare time" basement finishing project. It has been quite a bit of work, but with the worst behind me now (drywall finishing), I'm on the home stretch! I spent all of labor day weekend on the final finish of drywall and texturing with a Wagner PowerTex (slick tool, but what a mess). I took a 3 day weekend this week as well to try and finish up the painting.
To refresh your memory, you can see the pre-drywall finish photos on this archived thread towards the top.
Archive Thread 26178
The attatched photos on this new thread are after all the drywall finishing, texturing, and primer coats are on. I'm finishing up the last of the color wall coats tomorrow, and then will start on the floor tile.
Items left to complete:
Install 2 celing light fixtures
Install wall to wall storage shelving, and shelf inside lighted detergent cubbie
Install floor tile, grout, prime, paint, install and caulk joints of baseboard trim and corner round.
Install custom pedestal, Miele Washer and Dryer. Washer is temporarily up in the kitchen hooked to sink, and dryer is still crated burried in the family room. Still using my LG dryer and moving it around as needed while basement is being finished. I can't use the dryer anywhere else as this is the only 240 volt outlet in the house
Purchase and install water softener under stairwell cove.
Purchase commercial grade utility table for folding clothing on.
Purchase and have carpet / pad installed on stairs leading to basement.
Trim out inside of door to basement.
-Sit back, relax, get drunk, and watch a few loads of wash in the Mieles
-Get royally chewed out by boyfriend for blowing the original project quote of $900. Slight overage, including the Mieles, of only $6,050 and some change.
-Remain calm when shopping privledges for all of 2011 are revoked.
Andrew

To refresh your memory, you can see the pre-drywall finish photos on this archived thread towards the top.
Archive Thread 26178
The attatched photos on this new thread are after all the drywall finishing, texturing, and primer coats are on. I'm finishing up the last of the color wall coats tomorrow, and then will start on the floor tile.
Items left to complete:
Install 2 celing light fixtures
Install wall to wall storage shelving, and shelf inside lighted detergent cubbie
Install floor tile, grout, prime, paint, install and caulk joints of baseboard trim and corner round.
Install custom pedestal, Miele Washer and Dryer. Washer is temporarily up in the kitchen hooked to sink, and dryer is still crated burried in the family room. Still using my LG dryer and moving it around as needed while basement is being finished. I can't use the dryer anywhere else as this is the only 240 volt outlet in the house

Purchase and install water softener under stairwell cove.
Purchase commercial grade utility table for folding clothing on.
Purchase and have carpet / pad installed on stairs leading to basement.
Trim out inside of door to basement.
-Sit back, relax, get drunk, and watch a few loads of wash in the Mieles

-Get royally chewed out by boyfriend for blowing the original project quote of $900. Slight overage, including the Mieles, of only $6,050 and some change.
-Remain calm when shopping privledges for all of 2011 are revoked.
Andrew