Ok, I know I'm suppose to be working on number 2 first but I had to get the floor down in this one first. It's starting to get cold here so we thought we should get a move on it.
First, let me tell you it was no easy task! We had to jack hammer a bunch of concrete out to level the floor. It settled over time and was bowed and cracked all to hell. Then we filled it back in and leveled it.
Since most floors are the regular checkered, (being the pain in the ass that I am) I decided to lay it in the diamond pattern. Cuts were a lot harder that way but oh well.
Before anyone says anything about the appliances,the Pink frigidaire is going down into #2 and so is the table and chairs. The 56 GE isn't painted yet.(Had to have a beer fridge)Plus, Gladys can't go down there until the floor is laid.
All the accent stuff is going to be yellow in #3.
Still have to finish the cabinets and counter top. Lighting and all that other good stuff.
I just thought I'd let you guys see something so you don't think I've been blowing smoke all this time!
First, let me tell you it was no easy task! We had to jack hammer a bunch of concrete out to level the floor. It settled over time and was bowed and cracked all to hell. Then we filled it back in and leveled it.
Since most floors are the regular checkered, (being the pain in the ass that I am) I decided to lay it in the diamond pattern. Cuts were a lot harder that way but oh well.
Before anyone says anything about the appliances,the Pink frigidaire is going down into #2 and so is the table and chairs. The 56 GE isn't painted yet.(Had to have a beer fridge)Plus, Gladys can't go down there until the floor is laid.
All the accent stuff is going to be yellow in #3.
Still have to finish the cabinets and counter top. Lighting and all that other good stuff.
I just thought I'd let you guys see something so you don't think I've been blowing smoke all this time!