RE563,
Last night I ran the heavy duty cycle, pro-scrub turned on, high temp. scrub on, heated dry. The full cycle took 110 min. whereas the min. time specified in the manual is 95 min. Everything came out spotless included the roast pan which was from the evening before.
Gary
Last night I ran the heavy duty cycle, pro-scrub turned on, high temp. scrub on, heated dry. The full cycle took 110 min. whereas the min. time specified in the manual is 95 min. Everything came out spotless included the roast pan which was from the evening before.
Gary