Kitchen

Automatic Washer - The world's coolest Washing Machines, Dryers and Dishwashers

Help Support :

westie2

Well-known member
Joined
Sep 22, 2004
Messages
1,997
As promised here is a picture of our kitchen that is being redon due to water damage.

3-24-2008-08-06-19--westie2.jpg
 
Kitchen

The above picture was last Monday before the start of the tear out. Since the cabinets were built in place everything has to be removed to get to the subfloor. Next picture is where they have started removing the cabinets.

3-24-2008-08-19-40--westie2.jpg
 
The floor removal

A pin hole leak in the tubing leading to the icemaker did this. The restoration company had run a dehumidifer for 4 weeks to try and get rid of all the moisture under the tile before starting the tear out. It helped but still a nasty semlly mess. The subfloor is particle board.

3-24-2008-08-26-19--westie2.jpg
 
Smell

They have removed all the subfloor and tile from the breakfast area to the utility. They have sprayed fungicide and odor killer but the rest of the house now has a musky mold smell. What would be good to help remove the smell? Any ideas will help. We are using Febreze and has helped some. The restoration company will start today replacing the floor and sheetrock they have removed.
 
I have had to deal with this problem myself in the past. The only way to help rid the house of the smell is to put a small fan in the kitchen window exhausting out, you can cut some wood or cardboard to fit. Then open another window in the house 1 or 2 rooms over about and inch. Leave running while you are home. I know it is winter and the heat will run more, but this is the only way to remove the smell. It is not healthy to be breathing in that air. Can cause sinus problems and other issues. It will only be for a few days so it will be worth your health for the extra heating charges.
Jon
 
We have a windowfan will run it today supposed to get up to 68 here today so can leave the furnace off and wear a jacket or sweater. Have been spending nightw at my mothers home across town.

The leak was from the plastic hose from the wall to the refrigerator. Now have the stainless braided hose.

The roofing felt, subfloor and the concrete board will be installed today. The tile tomorrow and grout on Thursday then off the floor until Monday and cabinets will be installed.
 
The restoration company is going to put an ionisor in the house to helpo get rid of the smell. I have sindows open right now trying to air the rest of the house out. This picture is looking from the kitchen area to the family room that is walled off with plastic.

3-25-2008-09-24-2--westie2.jpg
 
The tile is being installed today and they will grout tomorrow morning. Cabinets are ready and will be installed after the walls are floated and repainted along with the ceiling.

3-28-2008-14-53-1--westie2.jpg
 
The hard part is over now...

And the fun part begins! Bet you cant wait until it is finished, however. =)
 
Sorry you had to go through this!
In the end I'm sure it will be beautiful.

Stainless braided hoses are stll plastique underneath. Perhpaps copper tubing is more sturdy? And watch those self-piercing valves,they too can leak eventually. Better is to use a real valve, sweated in.

:-)

Hey Gansky and Mark LightedControls, did we ever see the results of your new & finished kithcens?
 
Cabinet

Here is a picture of a cabinet end. Sorry for the quality but forgot my camera and had to use cell phone. They have made the cabinet ends look like the doors.

3-29-2008-10-43-48--westie2.jpg
 
Cabitnets almost in

Here is a shot of the cabinets almost in. It has been slow going getting things done.

4-9-2008-10-25-43--westie2.jpg
 
Living with remodeling is hell.

Thanks for showing there's eventually an end to the process!

Easy to lose sight of that fact when it drags on!
 

Latest posts

Back
Top