westyslantfront
Well-known member
- Joined
- Dec 11, 2004
- Messages
- 1,718
Hi Veg. I am having tankless put in. The vent pipe had to be changed. Also, an air intake pipe was installed on the roof.
The gas supply line had to be changed to a 1 inch line. That had to be run over the roof from the central a/c/furnace.
Almost ready to fire up the new water heater.
Ross
The gas supply line had to be changed to a 1 inch line. That had to be run over the roof from the central a/c/furnace.
Almost ready to fire up the new water heater.
Ross