It may be possible to go overboard with diswashers...
If I get this one, it will be 31.
I can barely navigate through the back part of my basement right now - I have about 25 or so machines randomly scattered about the back area of the basement while the front part is torn apart for the "museum room" construction. And, since I am a complete slack-ass, who knows if I will ever get done. Thus far in 5.5 months I have managed to accomplish is demo of the floor, walls, and ceiling. I have just started cleaning the concrete slab so that it will hopefully accept granite tile without adhesion problems in the future. Never mind the actual walls that have to be built back and sheet-rocked, the plumbing to install, the electrical to install, and everything else.