eurekastar
Well-known member
My A407 washed quite well in it's regular cycle, but I didn't like the way the other cycles functioned. So I cobbled together a non-Permanent Press timer, speed switch, two speed motor and harness and converted the A407 to an A606. I also have an A606 timer and dial with the PP setting that I may install some day. Mainly, I wanted a set up with true low speed agitation. BTW, I found a four option temperature switch, which I also installed!
I'm curious however about the variations of the A606. Was the non-PP version rolled out first or were PP and non-PP versions always available at the same time. The other thing I noticed is the Maytag switched from three to four water level options at some point. Did that come with the introduction of PP or was it always an option. Also, the parts lists still out there list a switch with four wash/rinse options. Did that come with the introduction of PP.
I have a service manual, which covers the 06 and 07 series. It looks like each model in the 06 series had PP and non-PP versions. I prefer the non-PP timer because it has a 13 1/2 minutes was time. In PP versions that time is dropped down to 10 minutes with 8 on the PP cycle.
Sorry for all the questions but it makes me wonder if all these changes represent options in the 06 series of if they were production run changes during the series.

I'm curious however about the variations of the A606. Was the non-PP version rolled out first or were PP and non-PP versions always available at the same time. The other thing I noticed is the Maytag switched from three to four water level options at some point. Did that come with the introduction of PP or was it always an option. Also, the parts lists still out there list a switch with four wash/rinse options. Did that come with the introduction of PP.
I have a service manual, which covers the 06 and 07 series. It looks like each model in the 06 series had PP and non-PP versions. I prefer the non-PP timer because it has a 13 1/2 minutes was time. In PP versions that time is dropped down to 10 minutes with 8 on the PP cycle.
Sorry for all the questions but it makes me wonder if all these changes represent options in the 06 series of if they were production run changes during the series.